Drug Manufacturing Licence in Pakistan: DRAP Site, Layout and CLB Approval Process

DRAP drug manufacturing licence process in Pakistan

A Drug Manufacturing Licence (DML) in Pakistan is granted by DRAP’s Central Licensing Board (CLB) under the Drugs (Licensing, Registering and Advertising) Rules, 1976. It is a three-stage process: site verification, approval of the building layout plan, and, after construction, an application on Form 1 for grant of the licence, followed by a panel inspection and CLB approval. The licence covers specific manufacturing sections (for example tablets, capsules or oral liquids), and each product still needs separate registration before it can be sold.

Key Takeaways

  • Do not start construction before DRAP approves both the site and the layout plan.
  • DRAP’s process documents specify a minimum site area for a new pharmaceutical unit; check it before buying land.
  • The licence is granted section by section, so plan every dosage form you intend to make.
  • Qualified production and quality control heads are required before inspection.
  • A DML lets you manufacture; product registration lets you sell.

Who Needs a Drug Manufacturing Licence?

Anyone manufacturing finished drugs for human or veterinary use, or doing basic, semi-basic or repacking operations, needs a DML. If you are unsure whether your product is a drug, a health product, a medical device or a cosmetic, read our DRAP classification guide first. Supplements and nutraceuticals follow a different route, covered in DRAP enlistment for nutraceuticals, and devices follow DRAP medical device registration.

Stage 1: Site Verification

  1. Submit the site verification application through DRAP’s online system with ownership or lease documents, a site plan, company documents and the prescribed fee.
  2. The Chairman CLB nominates officers or a panel to inspect the site.
  3. The panel checks the location, surroundings, access, size and suitability for pharmaceutical manufacturing, away from sources of contamination.
  4. If approved, DRAP issues a site approval letter and advises you to submit the layout plan. If rejected, you receive reasons and can appeal.

Stage 2: Layout Plan Approval

Submit the proposed building layout as AutoCAD drawings with the site approval letter and fee. DRAP’s layout committee checks:

  • separate sections for each dosage form, with dedicated areas where required (for example for penicillins or hormones);
  • personnel and material flows, changing rooms and airlocks;
  • warehouse areas for quarantine, approved and rejected materials;
  • a quality control laboratory, including microbiology where needed;
  • utilities such as purified water, HVAC and compressed air.

Once approved, a signed and stamped copy is returned for construction. Changing the layout during construction needs fresh approval, so involve your engineers before submission.

Stage 3: Construction, Equipment and Staff

Build exactly to the approved layout and install validated equipment. Before applying for the licence, have in place:

RequirementWhat inspectors look for
HVAC and cleanroomsCorrect air classes, pressure differentials, filtration and qualification records
Water systemPurified water generation, distribution and testing data
Production equipmentInstallation, operational and performance qualification
QC laboratoryCalibrated instruments, reference standards and trained analysts
Key personnelQualified heads of production and quality control with required experience
DocumentationSOPs, batch records, validation master plan, self-inspection system

CEC supplies and calibrates instruments for QC labs, from spectrophotometers to autoclaves, and supports laboratory compliance.

Stage 4: Application for Grant of DML (Form 1)

  1. Apply on Form 1 with the approved layout, list of sections, details of technical staff, list of machinery and the fee.
  2. A panel of experts inspects the facility against GMP requirements.
  3. The panel’s report goes to the Central Licensing Board, which decides on the grant.
  4. If approved, DRAP issues the licence for the approved sections.

The licence must be renewed on Form 1A before it expires, and applying late attracts a daily surcharge. Adding a new section or changing the layout later requires DRAP approval.

After the Licence: Product Registration

Each product must be registered with DRAP’s Registration Board before marketing, with a dossier, stability data and pricing information. Plan registrations early, because the queue can take longer than the licensing itself.

Other Approvals You Will Need

Common Reasons for Delay

  • Buying land that is too small or near contamination sources.
  • Starting construction before layout approval.
  • HVAC designs that cannot achieve the required pressure cascades.
  • Unqualified or part-time technical staff at inspection.
  • Incomplete validation and SOP documentation.

Frequently Asked Questions

Who issues the drug manufacturing licence in Pakistan?

The Central Licensing Board of the Drug Regulatory Authority of Pakistan grants drug manufacturing licences under the Drugs (Licensing, Registering and Advertising) Rules, 1976.

What are the stages of getting a DML?

Site verification, approval of the building layout plan, construction to the approved layout, and an application on Form 1 followed by a panel inspection and CLB approval.

Can I start construction before layout approval?

You should not. DRAP checks that the building matches the approved layout, and changes made without approval can delay or block the licence.

Does a DML allow me to sell medicines?

No. The DML allows manufacturing in approved sections. Each product must also be registered with DRAP before it can be marketed.

How is a DML renewed?

The manufacturer applies for renewal on Form 1A before expiry. DRAP inspects the facility and the CLB decides on renewal; late applications attract a surcharge.

Planning a Pharmaceutical Unit?

CEC supports site and layout submissions, QC lab setup and DRAP licensing for manufacturers. See our healthcare licensing services or contact our team.

This article is general information. DRAP fees, forms and guidelines are revised periodically; confirm the current requirements with DRAP before applying.

What do you think?
Insights

More Related Articles

Share Transfer and Change of Directors in a Pakistani Private Company: SECP Process and Forms

How to Start a Cosmetics Manufacturing Business in Pakistan: Licences, Plant and Quality

How to Close a Company in Pakistan: SECP Easy Exit, Strike Off and Winding Up